More

    Egypt Seeks $590 Million European Loan to Advance Alexandria Metro Expansion

    Egypt is pursuing a €500 million ($590 million) loan from European financial institutions to finance the second phase of the Alexandria Metro project, as authorities accelerate efforts to modernise transport infrastructure in the coastal city.

    According to a report by Asharq Business, the proposed funding forms part of Cairo’s broader strategy to ease congestion and upgrade urban mobility in Alexandria. 

    Once fully completed, the metro line is expected to stretch 43 kilometres, linking Abu Qir in the east to Borg El Arab in the west. 

    The trains will be capable of operating at speeds of up to 100 kilometres per hour.

    Under the second-phase blueprint, the network will expand by 31 kilometres and add 22 passenger stations. 

    Don’t Miss This: IFC, ASR to Empower 1,000 Female Entrepreneurs Across Africa

    Of this extension, 19 kilometres will be elevated while 12 kilometres will run at ground level.

    Sources familiar with the project indicated that initial external financing requirements exceeded $1 billion. 

    However, Egyptian officials are now working to scale down foreign borrowing by strengthening domestic production capacity and limiting imports to specialised equipment that cannot be manufactured locally.

    The localisation strategy has already drawn interest from major global rail manufacturers. Among them is Alstom, which is developing an industrial complex in Borg El Arab. 

    The facility is expected to produce electrical systems and rolling stock for metro, tram, monorail and high-speed rail projects, supporting Egypt’s ambition to build a stronger local rail manufacturing base.

    Egypt’s Ministry of Transport recently released aerial footage showing progress on the project’s first phase. 

    That segment spans 21.7 kilometres, running from Abu Qir Railway Station to Misr Station and incorporating 20 stations, including both surface and elevated stops.

    Officials view the Alexandria Metro as a cornerstone of efforts to relieve mounting traffic pressure while modernising one of Egypt’s most vital coastal corridors. 

    The planned European financing is expected to accelerate construction and help bring the second phase closer to completion.

    Sign up for our free Daily newsletter

    We'll be in your inbox every morning Monday-Saturday with top business news, inspiring stories, best advice and exclusive reporting from Entrepreneur.

    Related Posts

    LEAVE A REPLY

    Please enter your comment!
    Please enter your name here

    Latest

    LG Unveils AI-Powered Smart Home Innovations

    LG Electronics has introduced a new range of artificial intelligence-driven home solutions at InnoFest 2026 in Abu Dhabi and Mega HORECA 2026 in Nigeria,...

    US Capital Inflows into Nigeria Surge 566% to $2.23bn

    Investors from the United States channelled $2.23bn into Nigeria’s economy in the first nine months of 2025, marking a dramatic 566.02 per cent increase...

    Oando to Distribute Over 600 Million Shares in Second Tranche

    Oando Plc has announced plans to move forward with the second tranche of its share distribution programme, with more than 600 million ordinary shares...

    FG Targets $1bn Annual Investment, 500,000 Jobs in Mining Drive

    The Federal Government has unveiled ambitious plans to transform Nigeria’s mining sector, projecting up to $1 billion in foreign direct investment annually by 2025...

    Western Energy Traders Secure Libya Fuel Deals in Strategic Move from Russian Imports

    Libya has handed major fuel supply contracts to leading Western energy trading firms, marking a clear pivot away from Russian refined fuel imports as...